... truncated spur 削断山嘴 ; 截切山嘴 ; 削断山咀切削山咀 ; 削断山咀 spur pile 斜桩 bony spur 骨刺 ; 释义骨刺 ...
基于156个网页-相关网页
The study on the spur pile structure includes: discipline for the size optimization of caisson and the recommend size, the changing discipline of the pile stress and the comparison between the vertical pile plan and the spur pile plan.
复合斜桩结构研究的主要内容有:提出沉箱尺寸的优化规律并给出推荐尺寸,提出桩基应力的变化规律,以及复合斜桩方案与复合直桩方案的全方面对比。
参考来源 - 开敞式深水码头复合结构优化研究·2,447,543篇论文数据,部分数据来源于NoteExpress
Three kinds of permeable pile dikes with different seepage rate are tested, and effect of flow control is basically the same with the spur dike.
试验的三种透水率桩坝,其导流效果与实体丁坝群的基本相同,并未因部分透水及形态不同而使其控导作用明显减弱。
Three kinds of permeable pile dikes with different seepage rate are tested, and effect of flow control is basically the same with the spur dike,.
试验的三种透水率桩坝,其导流效果与实体丁坝群的基本相同,并未因部分透水及形态不同而使其控导作用明显减弱。
应用推荐